Steve Goffic Maintenance Supervisor

Jan / 27 / 2014

Wheelchair friendly ramp has been added to the rear of George M Dawson High School.

New firewalls have been added to three schools Sk’aadgaa Naay Elementary, Tahayghen Elementary, Queen Charlotte Secondary

South Maintenance completed a new floor in the clinic at Agnes L. Mathers Elementary.

North Maintenance currently working on upgrading the boys’ bathroom at Tahayghen Elementary.

Link aggregation has been added to George M Dawson to improve login times for students.

Water filtration at Agnes L. Mathers has finished being installed. We are now waiting for the water samples to return.

We are now starting to plan for summer maintenance.  In the meantime, we will be continuing to perform general maintenance as needed.

Oct / 30 / 2013

In progress Water filtration Agnes L. Mathers Elementary

photo

 

 

 

 

 

 

 

Completion of Kitchen Sk’aadgaa Naay Elementary

photo 4 photo 3 photo 2

 

 

 

 

 

 

 

Completion of 2 new Boilers at George M Dawson Secondary

photo 1 photo 3

 

 

 

 

 

 

 

Sep / 1 / 2013

New strong start room completed.

IMGP2342

 

 

 

 

 

 

 

New grade 7 classroom Tahayghen Elementary

IMGP2337

 

 

 

 

 

 

 

Final touches NWCC

IMGP2345 IMGP2334 IMGP2333 IMGP2332

 

 

 

 

 

 

 

Aug / 11 / 2013

IMG_0308

 

 

 

 

 

 

 

The new water filtration was Roughed in at GMD and now is ready to be moved to and reassembled at Agnes L. Mathers Elementary.

 

IMG_0300 IMG_0301

 

 

 

 

 

 

 

New strong start room almost complete. It’s getting it’s final scrub down.

IMG_0303

 

 

 

 

 

 

 

Complete. New cubbies at Tahayghen Elementary.

 

IMG_0304 IMG_0305

 

 

 

 

 

 

 

The removal and reinstallation of boiler two at George M Dawson Secondary.

 

IMG_0310

 

 

 

 

 

 

 

Completed. The refinishing of gym floors in Sk’aadgaa Naay Elementary, Port Clements Elementary, Agnes L. Mathers Elementary and the refinishing of the art room floor in Queen Charlotte Secondary.

 

IMG_0302

 

 

 

 

 

 

 

Completed. Newly renovated classroom in Tahayghen Elementary.

 

 

Aug / 07 / 2013

Queen Charlotte Secondary has finished being cleaned and is ready for September.

IMG_0299 IMG_0298

 

 

 

 

 

 

 

The new DDC (Heating Control System) is being installed at Queen Charlotte Secondary and boiler three assembly is almost completed.

 

IMG_0287 IMG_0286

 

 

 

 

 

 

 

 

July / 25 / 2013

Today at ALM we started getting the gym floors prepped for refinishing.

IMG_0271

 

 

 

 

 

 

 

July / 23 / 2013

Sk’aadgaa Naays kitchens ready for rebuild.

IMG_0235

 

 

 

 

 

 

 

Things are moving at Tahayghen. The maintenance staff is hard at work painting, plumbing, wiring. Some new photos of progress.

 

 

IMG_0258 IMG_0257 IMG_0259 IMG_0262 IMG_0263 IMG_0264 IMG_0265 IMG_0255 IMG_0260 IMG_0268 IMG_0269

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

July / 9 / 2013

Completion of the wiring in Sk’aadgaa Naay Elementary’s computer lab.

IMG_0211 IMG_0209

 

 

 

 

 

 

 

N.W.C.C. renovation progress: t-bar painted and prepping walls for paint. Work by North Maintenance staff.

DSCF1388

 

 

 

 

 

 

 

Mr Keir’s new classroom: dividing wall removed, new paint on t-bar grid and walls, new ceiling tile.  Work by North Maintenance staff.

DSCF1386

 

 

 

 

 

 

 

Completion of Tahayghen Climbing Wall. Materials supplied by School and PAC and labor provided by North Maintenance Staff.

DSCF1382

 

 

 

 

 

 

 

Personal “cubbies” for students, constructed by North Maintenance Staff

DSCF1378

 

 

 

 

 

 

 

District Plumbing Apprentice Noel Bellis roughing-in plumbing in Tahayghen crawlspace for new bathroom  at N.W.C.C. project.

DSCF1401

 

 

 

 

 

 

 

July / 8 / 2013

Recently finished project. New fiber-optic connection from the LAN one to LAN two room at Queen Charlotte Secondary. Here’s some before-and-after shots.

IMG_0202 IMG_0203

 

 

 

 

 

 

 

Recently finished project. The replacement of the roof at the south end maintenance shop.

IMG_0105 IMG_0205

 

 

 

 

 

 

 

July / 5 / 2013

Work is well underway in Masset. Here are some shots of the new college going into Tahayghen Elementary.

IMG_0191-1 IMG_0190

 

 

 

 

 

 

 

And on the IT side of things, here’s some before-and-after shots of  the new switchgear in the second LAN room at George M Dawson Secondary.

 

IMG_0193 IMG_0194

 

 

 

 

 

 

 

July / 4 / 2013

Well summer maintenance has started.
I would like to show everyone some of the things we will be working on this summer.
So please keep coming back for updates.

Here’s some photos of the playground and kitchen going into Sk’aadgaa Naay Elementary.

photo IMG_0182 IMG_0184 IMG_0183IMG_0186 IMG_0187 IMG_0188